Pre-Commissioning Supervisors

Coast Renewable Services · Dundee, United Kingdom
Location
Dundee, United Kingdom
Work mode
On-site
Type
Contract
Salary
Not stated
Department
Service & Construction
Posted
20 Nov 2026

Verified open 24 Nov 2026 · Source: Recruitee

About the role

About Coast Renewable Services

At Coast Renewable Services, our purpose is simple: to maximise the performance of our customers’ assets.

We know that great performance starts with great people. Founded in 2013, Coast Renewable Services has been delivering high-quality renewable solutions across the UK and Europe, built on expertise, commitment, and care.

The role: Pre-Commissioning Supervisor

Location: UK: Scotland

Contract Type: Inside IR35

Responsible for carrying out pre-commissioning activities on wind turbine nacelles and hubs using the Nacelle Power Unit (NPU), ensuring all systems are safely prepared, energised, tested and ready for offshore installation.

Key Responsibilities

  • Complete safety checks and confirm worksite readiness.

  • Set up NPU connections and verify electrical and mechanical installations.

  • Inspect nacelle and hub systems, including hydraulic, cooling and lubrication equipment.

  • Energise turbine systems and configure software, networks and parameters.

  • Carry out functional testing of emergency stops, detection systems, pitch and backup power.

  • Operate generator in motor mode while monitoring performance and system alarms.

  • Complete SCADA checks, safely disconnect the NPU and prepare the turbine for transport and installation.

Requirements

Only applicants who meet the specified requirements should apply. Thank you for your understanding and cooperation.

  • OGUK Medical + Chester Step

  • GWO Basic Safety Training

  • GWO Lift User

  • CSCS/CCNSG card

  • CITB Test

  • UK Drivers Licence

  • Right to work in the UK

Vestas E - Learnings

  • Electrical Safety for Ordinary Electrical Persons e-learning

  • Electrical Safety for Qualified Electrical Persons (ESQ) (Vestas)

  • Lockout Level 2 (LOTO 2) (Vestas)

  • V236 - Tower Pre-com Unit (TPU) e-learning

  • V236 - Nacelle Pre-com Unit (NPU) e-learning

  • Test Operator e-learning

  • Low Voltage: Vestas Electrical Awareness Training

About once a week, only when there is something new. One click to stop. Privacy

Similar jobs in Dundee at other employers

More jobs at Coast Renewable Services

Browse similar jobs